Page 1 of 1

HCPU Recomission Ongoing

Posted: Fri Sep 25, 2020 8:12 pm
by Zazwaldo
Hi all,

Some pics of the ongoing recommission of the Hi-cap pick up. Done a fair list of things so far. Trying to save as much as possible of the original panels and paint.

New fuel tank, brakes, wheel cylinders, kuni brake lines, shocks all round, cleaned springs, window seals, new rad (bigger core), composite inlet gasket, switched to SU’s, all oils and filters, started repairing O/S door frame today, removed headlining

Lots still to do - clean headlining, N/S door top, new hinges, t-cut, new 255/85 x 16, remove and paint fuel tank, replace hcpu front body mounts, repair sills, repair footwells, tig front wings (steering box cover cover etc)

Not very good at remembering to take pics as I go...

Re: HCPU Recomission Ongoing

Posted: Fri Sep 25, 2020 8:14 pm
by Zazwaldo
Few more pics

Re: HCPU Recomission Ongoing

Posted: Fri Sep 25, 2020 8:15 pm
by Zazwaldo
More

Re: HCPU Recomission Ongoing

Posted: Sat Sep 26, 2020 10:25 am
by Cliff4WD
Looking good 👍🏻

Re: HCPU Recomission Ongoing

Posted: Sat Sep 26, 2020 11:51 am
by Zazwaldo
Thanks Cliff

Watching your thread too.

Trying my hardest not to turn into another full resto! Already have a 101 and a Range Rover in a 1000 bits.

Re: HCPU Recomission Ongoing

Posted: Sun Sep 27, 2020 8:09 pm
by disco2hse
Looking great. Those metal worms sure had a good munch on the doors.